BTC Miner Accelerates Revenue with Rapid Power Solution
The Challenge
Bitcoin miner operating industrial-scale operations across North America, Europe and Central Asia sought economical power for new West Texas operations.
Solution
PPM delivered site selection and development, power procurement, design-build EPCM, and load management support. The substation was energized quickly, enabling the customer to begin operations and revenue generation while realizing significant energy cost savings.
Bottom Line
PPM enabled revenue generation for the site in 6 months, with a ~90% reduction in TDSP charges.