Upstream Producer Eliminates Power-based Delays

The Challenge

Upstream oil and gas producer sought to eliminate rental power-gen costs while bringing operations online without having to wait for sufficient grid capacity.

Solution

Priority Power negotiated competitive power procurement with the current contract, while constructing a substation and 35 miles of medium-voltage infrastructure to reduce energy costs, improve resiliency, and position the company for future growth.

Services

  • Energy Procurement
  • Asset Management
  • Energy Infrastructure

Bottom Line

Infrastructure-As-A-Service met power demand quickly, reducing costs and operational risk.